Industry · Manufacturing
Know what a unit actually costs you.
Bills of materials, job work sent outside, and production that finally agrees with stock. Built for factories running on part-time ERP and full-time spreadsheets.
Free consultation · Fixed-scope quote · Transparent per-user pricing


If this is your factory
The costing sheet is a year out of date.
Job work leaves the books
Material goes out for coating, machining or plating and stops appearing anywhere until someone records the return.
Nobody knows the real margin
Prices are set on last year’s material rate plus a guess at labour, so a busy month can still be a loss-making one.
Stores and the floor disagree
Production reports one number, the godown counts another, and the gap is written off as scrap without anyone checking.
Dispatch paperwork is manual
The delivery challan, the invoice and the e-way bill are three separate jobs done by three people from the same data.
What you get
From raw material to dispatch.
Multi-level BOMs and routings
Sub-assemblies, scrap and by-products, so the recipe on screen matches what the floor consumes.
Job work stays on your books
Material at a job worker is tracked at their location and received back against the same order.
Cost that reflects reality
Material and machine time roll into the finished item, so pricing starts from what the unit actually cost.
Dispatch in one step
Challan, invoice and e-way bill raised together, and stock leaves the books as it leaves the gate.
A day on the floor
One order, start to finish.
Order and availability
A manufacturing order checks component stock before the floor starts, so work does not stall halfway.
Issue and produce
Components are consumed against the order and finished goods added as output, both as real stock moves.
Job work round trip
What goes out for outside processing remains visible as yours until it comes back.
Dispatch and bill
Finished goods ship with challan, GST invoice and e-way bill generated from the same record.
How we implement it
How a factory rollout runs.
Replaces
One line first
We model a single product end to end, prove the cost against your own workings, and only then extend.
Then the floor
Work centres, operation sequence and job workers set up the way the plant actually runs.
Then the rest
Remaining products follow the proven structure, so the risky part happens once.
Questions
Manufacturing questions we get first.
Do you work with job-work-heavy factories?
Yes, and it is usually the first thing we model. Material at a job worker stays tracked as your stock at their location, with the return received against the same order.
Our BOMs change often. Is that a problem?
No. Bills of materials are versioned, so a change applies to new orders without rewriting the history of what was already produced.
Can we start without touching production?
Yes. Many manufacturers go live on accounting, purchase and inventory first, then bring the floor on once those are steady.
Cost one of your products with us.
Book a free demo. Bring one bill of materials and we will build it, run an order through it, and show the cost per unit.